Search
9 results
Filter search resultsDiscussion Paper: Innovations in Monitoring and Evaluation
This discussion paper produced by the United Nations Development Programme discusses various innovations that are occurring in M&E, and the advantages and disadvantages of these methods.ResourceWeek 8: Guest blog: Innovation in development evaluation
Development aid is changing rapidly – so must development evaluation.BlogPositioning participation on the power spectrum
In the second blog in the 4-part series about participation in evaluation, Irene Guijt and Leslie Groves focus on making power relationships and values in 'participatory' evaluation processes explicit to avoid tokenistic partBlogPractical considerations for leading and working on a mixed methods project
This toolkit from Realities aims to support staff who lead or work on mixed options research projects to prepare for, design and carry out their projects.ResourceRegression discontinuity
Regression Discontinuity Design (RDD) is a quasi-experimental evaluation option that measures the impact of an intervention, or treatment, by applying a treatment assignment mechanism based on a continuous eligibility index which is a variaMethodIntroduction to mixed methods in impact evaluation
This guide, written by Michael Bamberger for InterAction outlines the elements of a mixed methods approach with particular reference to how it can be used in an impact evaluation.ResourceQuasi-experimental methods for impact evaluations
This video lecture, given by Dr Jyotsna Puri for the Asian Development Bank (ADB) and the International Initiative for Impact Evaluation (3ie), demonstrates how the use of quasi-experimental methods can circumvent the challenge of creatingResourceQuasi-experimental design and methods
This guide, written by Howard White and Shagun Sabarwal for UNICEF looks at the use of quasi-experimental design and methods in impact evaluation.ResourceUNICEF webinar: Quasi-experimental design and methods
What is the main difference between quasi-experiments and RCTs? How can I measure impact when establishing a control group is not an option?Resource